SR 34 @ SR 54
Project ID: 0020114 Notice to Proceed Date:
Project Manager: Stenley K. Mack Construction Percent Complete: %
Office: Traffic Operations Current Completion Date:
County: Coweta Work Completion Date:
Congressional District: 003 Construction Contract Amount:
State Senate District.: 028 Construction Contractor:
State House District: 067, 073 Preconstruction Status Report
Project Type: Reconstruction/Rehabilitation Construction Status Report
Project Status: Construction Work Program More Information...
Right of Way Authorization: Contact Us
Project Description:
The proposed alternave would provide addional EB through lane along SR 34. The addional through lane would start as a NB Free Flow Right Turn at Fischer Rd and terminate as a drop right turn lane at Trinity Chrisan School Driveway (about 0.5 mi). The alternave would also provide signalized dual NBR and extend WBL by 400¿ at the intersecon of SR 34 at SR 54. Addional works like earth work, signal cabinet and signal strain pole relocaon and ulity relocaon needs to be done for dual NBR construcon. To accommodate the addional through space 2 4 FT concrete medians would be proposed along SR 34. There would also be impacts to the sidewalk, pedestrian islands, and drainage structures that will be modi¿ed. Addional EB through lane would widen both inside and outside along SR 34 and that C &G & sidewalk would need to be rebuilt.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2026$586,091.00 
UTL (Utilities)2027$80,881.00 
CST (Construction)2027$2,022,014.00 