SR 34 @ SR 54
Project ID:
0020114
Notice to Proceed Date:
Project Manager:
Stenley K. Mack
Construction Percent Complete:
%
Office:
Traffic Operations
Current Completion Date:
County:
Coweta
Work Completion Date:
Congressional District:
003
Construction Contract Amount:
State Senate District.:
028
Construction Contractor:
State House District:
067, 073
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Construction Work Program
More Information...
Right of Way Authorization:
Contact Us
project_id
0020114
Project Description:
The proposed alternave would provide addional EB through lane along SR 34. The addional through lane would start as a NB Free Flow Right Turn at Fischer Rd and terminate as a drop right turn lane at Trinity Chrisan School Driveway (about 0.5 mi). The alternave would also provide signalized dual NBR and extend WBL by 400¿ at the intersecon of SR 34 at SR 54. Addional works like earth work, signal cabinet and signal strain pole relocaon and ulity relocaon needs to be done for dual NBR construcon. To accommodate the addional through space 2 4 FT concrete medians would be proposed along SR 34. There would also be impacts to the sidewalk, pedestrian islands, and drainage structures that will be modi¿ed. Addional EB through lane would widen both inside and outside along SR 34 and that C &G & sidewalk would need to be rebuilt.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2026
$586,091.00
UTL (Utilities)
2027
$80,881.00
CST (Construction)
2027
$2,022,014.00