project_id
0013733
SR 5/US 78 @ SR 6/US 278
Project ID:
0013733
Notice to Proceed Date:
Project Manager:
Royce Darnell Mitchell II
Construction Percent Complete:
%
Office:
Program Delivery
Current Completion Date:
County:
Douglas
Work Completion Date:
Congressional District:
013
Construction Contract Amount:
State Senate District.:
035
Construction Contractor:
State House District:
061
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Construction Work Program
More Information...
Right of Way Authorization:
Contact Us
project_id
0013733
Project Description:
This project is located in Douglas County at the intersection of SR 5/US 78/Veterans Memorial Hwy and SR 6/US 278/Thornton Rd, approximately 1.2 miles southwest of Austell and 1 mile east of Lithia Springs. This project consists of a new location Quadrant Roadway through the Northwest quadrant of the intersection connecting SR 5 and SR 6. The project is approximately 0.9 miles in length. Minor widening will occur along SR 5 and SR 6 in order to accommodate extra capacity. SR 6 westbound would be widened to 3 thru lanes through the SR 5 and Quadrant Roadway intersections along with a dedicated right turn lane to SR 5 and the proposed Quadrant Roadway; left turn movements will be prohibited at the SR 5 at SR 6 intersection. SR 5 southbound will have 3 lanes with the outside lane turning right only to SR 6 westbound. A raised median varying from 7-14-ft as well as a 14-ft flushed median will be added along SR 5. A 16-ft raised median will be added along SR 6.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2018
$1,000,000.00
ROW (Right of Way)
2024
$2,130,000.00
1/17/2023
UTL (Utilities)
2026
$1,323,000.00
7/10/2024
CST (Construction)
2026
$17,131,332.92
7/10/2024
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=95c9c235-5686-4505-85f3-77af48e02f12&Filename=0013733_L D_DEC2022.pdf
0013733_L&D_DEC2022.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=95c9c235-5686-4505-85f3-77af48e02f12&Filename=0013733_L D_DEC2022.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=c3efb449-a7cb-4536-9667-7b2160ce5154&Filename=0013733_L D_AD_JAN2023.pdf
0013733_L&D_AD_JAN2023.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=c3efb449-a7cb-4536-9667-7b2160ce5154&Filename=0013733_L D_AD_JAN2023.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=f93de201-62ba-4d0d-aef4-9916074672b5&Filename=0013733_CR_OCT2020.pdf
0013733_CR_OCT2020.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=f93de201-62ba-4d0d-aef4-9916074672b5&Filename=0013733_CR_OCT2020.pdf