SR 61 FM S OF CR 467/DALLAS NEBO RD TO SR 6
Project ID: 0013702 Notice to Proceed Date:
Project Manager: Adolfo Villarroel Construction Percent Complete: %
Office: Program Delivery Current Completion Date:
County: Paulding Work Completion Date:
Congressional District: 014 Construction Contract Amount:
State Senate District.: 031 Construction Contractor:
State House District: 017, 019 Preconstruction Status Report
Project Type: Reconstruction/Rehabilitation Construction Status Report
Project Status: Construction Work Program More Information...
Right of Way Authorization: Contact Us
Project Description:
The scope of this project consists of widening and reconstruction of SR 61 from CR 467/Dallas Nebo Road to US 278/SR 120/SR 6/Dallas Bypass in Paulding County. The existing roadway is a 2-lane/3-lane section with 12ft lanes and 4ft grassed shoulders. The proposed typical section is a 4-lane section with 12ft lanes, 10ft outside shoulders with 4ft paved, and a 20ft raised median. The double 5' X 5' culvert at Mill Creek and the two single 4' X 4' box culverts are to be extended. The project is 4.3 miles long. The existing bridge structure over the Silver Comet Trail will be widened from 38 ft to 92 ft.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2016$3,315,000.005/1/2019
ROW (Right of Way)2019$11,994,000.004/12/2019
PE (Preliminary Engineering)2024$220,816.165/1/2019
UTL (Utilities)2026$4,510,398.4211/20/2024
CST (Construction)2026$64,465,484.9311/20/2024