Home
Board
Employment
Blog
News
Contact Us
Project Information
Welcome to The GDOT
applications
GeoPI
Project Information
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Welcome to The GDOT
Currently selected
Recent
project_id
0007856
SR 155 FROM I-75 TO SR 42/US 23
Project ID:
0007856
Notice to Proceed Date:
Project Manager:
Michael Vincent Hamilton
Construction Percent Complete:
%
Office:
Program Delivery
Current Completion Date:
County:
Henry
Work Completion Date:
Congressional District:
010
Construction Contract Amount:
State Senate District.:
017, 025
Construction Contractor:
State House District:
115, 116, 117
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Construction Work Program
More Information...
Right of Way Authorization:
Contact Us
project_id
0007856
Project Description:
This project includes the widening of SR 155 from I-75 on the south terminus to SR 81 on the north terminus. The widening will increase the current number of lanes from 2 to 4 with an urban section including turn lanes. The existing bridge over Norfolk Southern Railroad will be studied for widening or replacement. The northern and southern termini of the project will be further determined once traffic data and operational analyses are completed.
Activity
Program Year
Cost Estimate
Date of Last Estimate
SCP (Scoping)
2016
$709,301.90
PE (Preliminary Engineering)
2016
$2,290,698.10
8/6/2015
ROW (Right of Way)
2024
$3,530,000.00
11/20/2024
ROW (Right of Way)
2025
$18,370,000.00
11/20/2024
UTL (Utilities)
2027
$11,946,800.00
7/1/2024
CST (Construction)
2027
$52,168,136.29
8/16/2024
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=07c31769-b0f8-43f6-bdf2-fa4675b958ab&Filename=0007856_L D_Affidavit_JUN2024.pdf
0007856_L&D_Affidavit_JUN2024.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=07c31769-b0f8-43f6-bdf2-fa4675b958ab&Filename=0007856_L D_Affidavit_JUN2024.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=7c4490d1-273e-4fd2-9844-2ed5a1426b25&Filename=0007856_L D_MAY2024.pdf
0007856_L&D_MAY2024.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=7c4490d1-273e-4fd2-9844-2ed5a1426b25&Filename=0007856_L D_MAY2024.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=ca9ab9d1-c867-4e1d-9151-cab2cf97ef3c&Filename=0007856_CR_APR2023.pdf
0007856_CR_APR2023.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=ca9ab9d1-c867-4e1d-9151-cab2cf97ef3c&Filename=0007856_CR_APR2023.pdf