SR 9 FROM MCFARLAND ROAD TO POST ROAD
Project ID: 0007844 Notice to Proceed Date:
Project Manager: Eka Okonmkpaeto Construction Percent Complete: 26.39%
Office: Program Delivery Current Completion Date:
County: Forsyth Work Completion Date:
Congressional District: 007 Construction Contract Amount:
State Senate District.: 027 Construction Contractor: VERTICAL EARTH INCORPORATED
State House District: 024 Preconstruction Status Report
Project Type: Reconstruction/Rehabilitation Construction Status Report
Project Status: Under Construction More Information...
Right of Way Authorization: Contact Us
Project Description:
Project CSSTP-0007-00(844) is located in southwest Forsyth County and includes the widening of SR 9/ Atlanta Highway from existing two lanes to four lanes with raised median and urban shoulders. Project begins north of the intersection with CR 458/McFarland Parkway and ends just past the intersection with SR 371/Post Road/Mullinax Road for a total project length of 2.4 miles. Horizontal and vertical geometry will meet a 45-mph design speed and normal right-of-way will be set at the shoulder break for an 84-foot minimum right-of-way corridor. Proposed roadway will be an urban section with two (2) 11-foot travel lanes in each direction and separated by a 16-foot raised median. There will be a 12-foot shoulder on each side with a 5-foot sidewalk.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2007$1,117,119.9310/19/2018
PE (Preliminary Engineering)2016$2,070,000.0010/19/2018
ROW (Right of Way)2017$20,870,000.0011/28/2016
PE (Preliminary Engineering)2019$390,000.0010/19/2018
CST (Construction)2022$41,958,408.917/22/2021