SARDIS RD CONN FM SR 60 TO SARDIS RD NEAR CHESTATEE RD
Project ID: 0003626 Notice to Proceed Date:
Project Manager: Kesha Wynn Construction Percent Complete: 0.00%
Office: Program Delivery Current Completion Date:
County: Hall Work Completion Date:
Congressional District: 009 Construction Contract Amount:
State Senate District.: 049 Construction Contractor: E. R. SNELL CONTRACTOR, INC.
State House District: 027 Preconstruction Status Report
Project Type: Reconstruction/Rehabilitation Construction Status Report
Project Status: Under Construction More Information...
Right of Way Authorization: Contact Us
Project Description:
The SARDIS ROAD CONNECTOR is the widening and reconstruction of several existing local roads and streets with some new roadway on new alignment. This project STP-0003-00(626) begins at the Sardis Road /Chestatee Road intersection and extends north to SR 60 in the vicinity of the intersection with Mt. Vernon Road. The alignment follows several existing local roads with some of the roadway on new location. The total project length is approximately 3.55 miles and will provide a connector roadway between S.R. 53 to the south and S.R. 60 to the north. The proposed roadway will consist of a four lane curb and gutter divided roadway, 2 lanes in each direction separated with a 20 foot wide, 6 inch high curb and gutter median. Sidewalk will be provided on both sides of the road.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering) $1,300,000.0012/9/2022
PE (Preliminary Engineering)2011$94,885.1812/9/2022
ROW (Right of Way)2021$20,763,000.0012/6/2018
PE (Preliminary Engineering)2023$18,000.0012/9/2022
UTL (Utilities)2025$2,066,777.005/13/2024
CST (Construction)2025$61,268,035.7912/13/2023