WESTOVER BLVD FROM ALBANY MALL TO N OF LEDO ROAD
Project ID: 0010571 Notice to Proceed Date:
Project Manager: Cassius Octavius Edwards Construction Percent Complete: 97.31%
Office: Program Delivery Current Completion Date:
County: Dougherty, Lee Work Completion Date:
Congressional District: 002 Construction Contract Amount:
State Senate District.: 012, 013 Construction Contractor: OXFORD CONSTRUCTION COMPANY
State House District: 152, 153 Preconstruction Status Report
Project Type: New Construction Construction Status Report
Project Status: Under Construction More Information...
Right of Way Authorization: Contact Us
Project Description:
The proposed project begins within the city limits of Albany in Dougherty County and terminates just north of Ledo Road in Lee County. This project consists of a new alignment connecting N Westover Blvd and Ledo Road. A roundabout is proposed at the intersection with N Westover Blvd. The southern portion of the newly completed Westover Extension in Lee County will require some reconstruction to better align with the proposed roadway. The mainline measures approximately 1200 ft from the roundabout to the tie in with the Westover Extension. A grade separation over Westover Blvd Ext will require 2500 ft of reconstruction along Liberty Expressway as well as two new bridges.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2013$1,660,973.988/1/2011
ROW (Right of Way)2017$250,000.001/6/2017
ROW (Right of Way)2018$640,000.001/6/2017
CST (Construction)2022$22,367,324.521/13/2022
Project Search (TransPI) Map
 Project Documents

Approved Concept Reports

 
 
 

Project Outreach Archive