SR 81 @ SOUTH RIVER
Project ID: 0013363 Notice to Proceed Date:
Project Manager: Linnon Nesbitt Construction Percent Complete: 99.95%
Office: Program Delivery Current Completion Date:
County: Henry, Newton Work Completion Date:
Congressional District: 004, 010 Construction Contract Amount:
State Senate District.: 017 Construction Contractor: WRIGHT BROTHERS CONSTRUCTION COMPANY, INC.
State House District: 113, 118 Preconstruction Status Report
Project Type: Replacement Construction Status Report
Project Status: Complete More Information...
Right of Way Authorization: Contact Us
Project Description:
The proposed project will replace the existing bridge at SR 81 over South River located in Henry and Newton Counties. The new bridge will be constructed on the existing alignment and an offsite detour will be implemented during construction. The proposed typical section is two 12-foot travel lanes (one in each direction) and 10-foot shoulders (4 feet paved and 6 feet unpaved) with rural side ditches. The total length of the project is approximately 0.42 miles.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2017$658,065.359/22/2015
ROW (Right of Way)2019$140,000.003/25/2019
CST (Construction)2020$4,973,282.56 