project_id
321880-
SR 41 @ CSX RAILROAD W OF WARM SPRINGS; INC DETOUR
Project ID:
321880-
Notice to Proceed Date:
Project Manager:
Derrick Cameron
Construction Percent Complete:
56.34%
Office:
Program Delivery
Current Completion Date:
County:
Meriwether
Work Completion Date:
Congressional District:
003
Construction Contract Amount:
State Senate District.:
029
Construction Contractor:
MCCOY GRADING, INC.
State House District:
137
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Under Construction
More Information...
Right of Way Authorization:
Contact Us
project_id
321880-
Project Description:
This project proposes the replacement of the CSX Railroad Bridge over SR 41 west of Warm Springs. A temporary railroad detour with a 50' long temporary bridge will be constructed south of the existing railroad track. The purpose of this is that the railroad is considered an historic resource. A programmatic section 4f for historic bridges is available for use. The new bridge of like kind will be built in the original location and the railroad will be shifted back to its original location. This will avoid a 4f situation. The proposed typical is a two lane rural section with 100' right of way. A design speed of 45 mph will be used along with 2:1 slopes and V-gutter to minimize environmental impacts and reduce construction cost.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
1992
$2,660,610.05
ROW (Right of Way)
2012
$1,120,000.00
5/2/2012
CST (Construction)
2017
$15,468,640.97
11/3/2015
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Project Outreach Archive
http://mydocs.dot.ga.gov/PublicOutreach/321880-/JPG/321880_DETOUR%20MAP.pdf
321880_DETOUR MAP.pdf
http://mydocs.dot.ga.gov/PublicOutreach/321880-/JPG/321880_DETOUR%20MAP.pdf
http://mydocs.dot.ga.gov/PublicOutreach/321880-/JPG/321880PIOH-Detour.pdf
321880PIOH-Detour.pdf
http://mydocs.dot.ga.gov/PublicOutreach/321880-/JPG/321880PIOH-Detour.pdf
http://mydocs.dot.ga.gov/PublicOutreach/321880-/JPG/321880PIOHRR.pdf
321880PIOHRR.pdf
http://mydocs.dot.ga.gov/PublicOutreach/321880-/JPG/321880PIOHRR.pdf
http://mydocs.dot.ga.gov/PublicOutreach/321880-/JPG/321880_PIOH_Display_SR%2041_40%20Scale.pdf
321880_PIOH_Display_SR 41_40 Scale.pdf
http://mydocs.dot.ga.gov/PublicOutreach/321880-/JPG/321880_PIOH_Display_SR%2041_40%20Scale.pdf
http://mydocs.dot.ga.gov/PublicOutreach/321880-/JPG/321880PIOHDISPLAY1.pdf
321880PIOHDISPLAY1.pdf
http://mydocs.dot.ga.gov/PublicOutreach/321880-/JPG/321880PIOHDISPLAY1.pdf
http://mydocs.dot.ga.gov/PublicOutreach/321880-/PDF/321880_Detour%20OH_7Apr2017.pdf
321880_Detour OH_7Apr2017.pdf
http://mydocs.dot.ga.gov/PublicOutreach/321880-/PDF/321880_Detour%20OH_7Apr2017.pdf
http://mydocs.dot.ga.gov/PublicOutreach/321880-/PDF/321880PIOHHandoutPackage.pdf
321880PIOHHandoutPackage.pdf
http://mydocs.dot.ga.gov/PublicOutreach/321880-/PDF/321880PIOHHandoutPackage.pdf
http://mydocs.dot.ga.gov/PublicOutreach/321880-/JPG/321880_PIOH_Display_CR%20378_40%20Scale.pdf
321880_PIOH_Display_CR 378_40 Scale.pdf
http://mydocs.dot.ga.gov/PublicOutreach/321880-/JPG/321880_PIOH_Display_CR%20378_40%20Scale.pdf