CS 833/MARTIN FARM ROAD @ SUWANEE CREEK IN SUWANEE
Project ID: 0015618 Notice to Proceed Date:
Project Manager: Brent Blocker Construction Percent Complete: 4.33%
Office: Program Delivery Current Completion Date:
County: Gwinnett Work Completion Date:
Congressional District: 009 Construction Contract Amount:
State Senate District.: 007 Construction Contractor: F. S. SCARBROUGH, LLC
State House District: 099 Preconstruction Status Report
Project Type: Replacement Construction Status Report
Project Status: Under Construction More Information...
Right of Way Authorization: Contact Us
Project Description:
This project replaces the existing bridge on CS 833 over Suwanee Creek in Gwinnett County.The bridge on Martin Farm Road over Suwanee Creek,was built in 1978. The bridge consists of six spans of precast concrete deck slab on concrete caps with steel piling. Due to the age of bridge, not meeting current design standards, and the bridge being classified as scour critical, replacement of this bridge is recommended. Off-site Detour is planned. Construction estimated to be 9 months.
ActivityProgram YearCost EstimateDate of Last Estimate
ROW (Right of Way)2018$315,000.00 
PE (Preliminary Engineering)2019$1,495,000.00 
ROW (Right of Way)2021$1,065,000.00 
CST (Construction)2024$5,215,843.923/9/2023
Project Search (TransPI) Map
 Project Documents

Approved Concept Reports