Home
Board
Employment
Blog
News
Contact Us
Project Information
Welcome to The GDOT
applications
GeoPI
Project Information
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Welcome to The GDOT
Currently selected
Recent
project_id
0013712
SR 11/SR 49/US 41 @ NS #734080Y 1.4 MI S OF MACON
Project ID:
0013712
Notice to Proceed Date:
Project Manager:
Victor Gill
Construction Percent Complete:
0.00%
Office:
Program Delivery
Current Completion Date:
County:
Bibb
Work Completion Date:
Congressional District:
002
Construction Contract Amount:
State Senate District.:
026
Construction Contractor:
F. S. SCARBROUGH, LLC
State House District:
143
Preconstruction Status Report
Project Type:
Replacement
Construction Status Report
Project Status:
Under Construction
More Information...
Right of Way Authorization:
Contact Us
project_id
0013712
Project Description:
The proposed project would be constructed partially on new roadway alignment to the west of the existing US 41 bridge over Norfolk Southern railroad. The new bridge would be approximately 319 feet long, 108 feet wide, and consist of six 12-foot travel lanes and 8-foot shoulders. The new alignment typical section would consist of six 12-foot travel lanes and 10-foot (6.5 feet paved) shoulders. The proposed project is approximately 4750 feet 0.9-miles long. Right-of-way would range from 165 to 445 feet wide, with the upper limit needed to accommodate a detention structure to the west of the new bridge
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2016
$1,992,192.57
ROW (Right of Way)
2022
$1,430,000.00
6/17/2021
CST (Construction)
2024
$19,535,269.77
10/15/2023
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=08f93d1f-6be1-4b5f-a079-a318e8a3e73e&Filename=0013712_L D_APR2022.pdf
0013712_L&D_APR2022.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=08f93d1f-6be1-4b5f-a079-a318e8a3e73e&Filename=0013712_L D_APR2022.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=1f9c739c-2375-4e5c-a1de-e9d5cbf874cd&Filename=0013712_CR_JUN2018.pdf
0013712_CR_JUN2018.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=1f9c739c-2375-4e5c-a1de-e9d5cbf874cd&Filename=0013712_CR_JUN2018.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=82c458d1-34de-411f-9c85-0eea957e6d0d&Filename=0013712_L D_AD_MAY2022.pdf
0013712_L&D_AD_MAY2022.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=82c458d1-34de-411f-9c85-0eea957e6d0d&Filename=0013712_L D_AD_MAY2022.pdf