0008666
KINGSLAND BYPASS FROM CR 61/VACUNA ROAD TO W OF I-95
Project ID:
0008666
Notice to Proceed Date:
Project Manager:
Cassius Octavius Edwards
Construction Percent Complete:
%
Office:
Program Delivery
Current Completion Date:
County:
Camden
Work Completion Date:
Congressional District:
001
Construction Contract Amount:
State Senate District.:
003
Construction Contractor:
State House District:
180
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Construction Work Program
More Information...
Right of Way Authorization:
Contact Us
project_id
0008666
Project Description:
Laurel Island Pkwy/Colerain Rd is currently a 2-lane corridor traversing east/west thru Camden Co., GA. The West Kingsland Bypass Phase 2 would begin at the intersection of SR 40 & Vacuna Rd (end of PI# 0000820) & then continue northeasterly along the alignment of Laurel Island Pkwy/Colerain Rd. The bypass continues on new alignment near the intersection of CR 109, crossing over the railroad & US 17 on structure, & then proceeds east on the existing alignment of Colerain Rd to tie into Kingsland Bypass Phase 1(PI# 0007414) approximately 2,500' west of I-95. The typical section will be 2 lanes in each direction with a depressed 32¿ median & rural shoulders from the beginning of the proj. to Old Still Rd. This typical section matches the typical section used in PI# 0000820. At Old Still Rd the typical section will change to an urban section with a 20¿ raised median, 5¿ sidewalk on the south side & 10¿ multiuse trail on the north side.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2011
$1,852,784.88
11/28/2018
PE (Preliminary Engineering)
2019
$995,271.02
11/28/2018
ROW (Right of Way)
2027
$5,372,000.00
5/16/2023
UTL (Utilities)
2029
$6,815,946.50
11/12/2024
CST (Construction)
2029
$57,513,414.60
11/20/2024
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=ef24239d-34c7-4a14-8f15-693c15c1f1b0&Filename=0008666_CR_MAR2013.pdf
0008666_CR_MAR2013.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=ef24239d-34c7-4a14-8f15-693c15c1f1b0&Filename=0008666_CR_MAR2013.pdf
Project Outreach Archive
http://mydocs.dot.ga.gov/PublicOutreach/0008666/PDF/0000820_0000821_0008666%20PIOH%20Packet%205-15-16-2013.pdf
0000820_0000821_0008666 PIOH Packet 5-15-16-2013.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0008666/PDF/0000820_0000821_0008666%20PIOH%20Packet%205-15-16-2013.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0008666/PDF/0008666%20Current%20Layout%20-.pdf
0008666 Current Layout -.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0008666/PDF/0008666%20Current%20Layout%20-.pdf