Home
Board
Employment
Blog
News
Contact Us
Project Information
Welcome to The GDOT
applications
GeoPI
Project Information
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Welcome to The GDOT
Currently selected
Recent
project_id
0004166
SR 3/NORTHSIDE DRIVE @ CS 53/COLLIER RD;CS364; 38; 6; 135
Project ID:
0004166
Notice to Proceed Date:
Project Manager:
George Curtis Baldwin Jr.
Construction Percent Complete:
98.61%
Office:
Program Delivery
Current Completion Date:
County:
Fulton
Work Completion Date:
Congressional District:
005
Construction Contract Amount:
State Senate District.:
006, 038, 039
Construction Contractor:
ASTRA GROUP LLC
State House District:
054, 055
Preconstruction Status Report
Project Type:
Safety
Construction Status Report
Project Status:
Complete
More Information...
Right of Way Authorization:
Contact Us
project_id
0004166
Project Description:
The proposed project consists of roadway and waterline improvements along Northside Drive/SR3/US41 from, I-75 north of the Northside Drive/Northside Parkway intersection. The roadway portion of the project from I-75 to Collier Road includes converting the existing reversible lane to a southbound through lane. In addition, a right turn lane is proposed for the existing northbound lane to Collier Road eastbound. From Collier Road north, the work includes converting the reversible lane to a two-way left turn lane until it connects to the existing four lane section. Signal equipment and pedestrian accommodations will be upgraded at the intersections of Collier Road, Woodward Way, Peachtree Battle Avenue, West Wesley Road, and Arden Road.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2004
$344,974.02
ROW (Right of Way)
2009
$5,540,000.00
3/26/2008
CST (Construction)
2013
$11,857,583.09
3/26/2008
CST (Construction)
2014
$19,185,992.27
3/26/2008
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=dd4b4695-dc9e-4504-a321-00605afb7356&Filename=0004166_CR.pdf
0004166_CR.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=dd4b4695-dc9e-4504-a321-00605afb7356&Filename=0004166_CR.pdf
Project Outreach Archive
http://mydocs.dot.ga.gov/PublicOutreach/0004166/PDF/Northside%20Dr%20Handout.pdf
Northside Dr Handout.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0004166/PDF/Northside%20Dr%20Handout.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0004166/JPG/Northside%20Dr%20PIOH%201.pdf
Northside Dr PIOH 1.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0004166/JPG/Northside%20Dr%20PIOH%201.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0004166/JPG/Northside%20Dr%20PIOH%203.pdf
Northside Dr PIOH 3.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0004166/JPG/Northside%20Dr%20PIOH%203.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0004166/JPG/Northside%20Dr%20PIOH%202.pdf
Northside Dr PIOH 2.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0004166/JPG/Northside%20Dr%20PIOH%202.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0004166/JPG/Northside%20Dr%20PIOH%204.pdf
Northside Dr PIOH 4.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0004166/JPG/Northside%20Dr%20PIOH%204.pdf