CS 34/FREEMANVILLE ROAD @ COOPER SANDY CREEK
Project ID: 0016582 Notice to Proceed Date:
Project Manager: Muhanad AlRawi Construction Percent Complete: %
Office: Program Delivery Current Completion Date:
County: Fulton Work Completion Date:
Congressional District: 006 Construction Contract Amount:
State Senate District.: 021 Construction Contractor:
State House District: 047 Preconstruction Status Report
Project Type: Replacement Construction Status Report
Project Status: Construction Work Program More Information...
Right of Way Authorization: Contact Us
Project Description:
Bridge replacement project of CS 34/Freemanville Road bridge over Cooper Sandy Creek located approximately 1.75 miles north of the City of Alpharetta. The total project length is approximately 0.5 miles. The project consists of replacing the existing 3 span bridge on County Street (CS) 34/Freemanville Road at Cooper Sandy Creek. The existing bridge, Structure ID 121-5153-0, was built in 1960, and consists of three 30-foot-long spans with an existing roadway width of 22.8¿ and an existing deck width of 24.2¿. CS 34 is functionally classified as an Urban Major Collector and has a posted speed limit of 45 mph. The existing typical consists of two 9-foot lanes, one in each direction with 5 and 8-foot graded shoulders. The existing bridge is expected to be replaced with a new bridge on the existing alignment utilizing an offsite detour. The new bridge will have a deck width of 43.5¿ with two 12-foot lanes, one in each direction and 6.5¿ sidewalks on both sides.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2020$955,000.00 
ROW (Right of Way)2024$900,000.001/8/2024
UTL (Utilities)2025$165,000.005/3/2024
CST (Construction)2025$2,309,438.835/3/2024