Currently selected
Recent
project_id
0013769
SR 8/SR 316/US 29 @ CR 929/OCONEE CONNECTOR
Project ID:
0013769
Notice to Proceed Date:
Project Manager:
Marlo Letrice Clowers
Construction Percent Complete:
%
Office:
P3
Current Completion Date:
County:
Oconee
Work Completion Date:
Congressional District:
010
Construction Contract Amount:
State Senate District.:
046
Construction Contractor:
State House District:
120, 121
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Construction Work Program
More Information...
Right of Way Authorization:
Contact Us
project_id
0013769
Project Description:
SR 316 is a primary east-west corridor in Northeast Georgia, connecting greater Atlanta and the Athens Metropolitan Area. In the section between I-85 in Gwinnett County and SR 10 Loop in Oconee County, access to SR 316 is currently provided by 9 grade-separated interchanges and 33 at-grade interchanges. CR 929/Oconee Connector serves as the primary access road for traffic bound for Watkinsville and points south via US 441. SR 316 is a designated freight corridor. Neither SR 316 nor CR 929/Oconee are part of the GRIP network or state bicycle route system. CR 929/Oconee Connector intersects SR 316 approximately 1 mile west of the existing SR 10 loop interchange and is currently configured as signalized at-grade intersection with slip lanes for all right turning movements. The proposed new interchange is needed to improve connectivity, accommodate expected growth in traffic volumes, and enhance operational traffic conditions in the proposed project area.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2019
$4,300,000.00
4/4/2024
PE (Preliminary Engineering)
2023
$4,000,000.00
4/4/2024
ROW (Right of Way)
2024
$1,730,000.00
6/14/2024
ROW (Right of Way)
2025
$1,940,000.00
6/14/2024
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=59f24423-f2d2-492e-98f9-82421fe044e8&Filename=0013767_0013768_0013769_L D_MAY2024.pdf
0013767_0013768_0013769_L&D_MAY2024.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=59f24423-f2d2-492e-98f9-82421fe044e8&Filename=0013767_0013768_0013769_L D_MAY2024.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=d9d658a0-0153-4204-a24e-e88b52f4f474&Filename=0013767_0013768_0013769_L D_Ad_JUL2024.pdf
0013767_0013768_0013769_L&D_Ad_JUL2024.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=d9d658a0-0153-4204-a24e-e88b52f4f474&Filename=0013767_0013768_0013769_L D_Ad_JUL2024.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=da94fafb-c1d4-49cc-9d55-0d88e4528067&Filename=0013768_0013769_CR_NOV2022.pdf
0013768_0013769_CR_NOV2022.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=da94fafb-c1d4-49cc-9d55-0d88e4528067&Filename=0013768_0013769_CR_NOV2022.pdf