SR 42 FROM DOWNTOWN MCDONOUGH TO SR 138
Project ID:
0007855
Notice to Proceed Date:
Project Manager:
Shanda G. Marsh
Construction Percent Complete:
%
Office:
Program Delivery
Current Completion Date:
County:
Henry
Work Completion Date:
Congressional District:
010, 013
Construction Contract Amount:
State Senate District.:
010, 017
Construction Contractor:
State House District:
115, 116
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Construction Work Program
More Information...
Right of Way Authorization:
Contact Us
project_id
0007855
Project Description:
Project PI 0007855 is located within the Atlanta MPO Boundary and listed in Atlanta MPO¿s RTP/TIP as HE-107. This segment of SR 42 in Henry County is classified as an urban minor arterial; except for a small segment on the north end between the intersections of Old Hwy and SR 138, which is classified as an urban principle arterial. This roadway connects to SR 138, which is designated by the Atlanta MPO as a regional truck route. Additionally, SR 42 is part of the Atlanta Regional Thoroughfare network and the Atlanta Regional Bicycle Transportation & Pedestrian Walkways network. From SR 138 to Woodruff Street, SR 42 is a two lane facility; except from Deer Trace Drive to Moye Drive where it is a three lane facility.
Activity
Program Year
Cost Estimate
Date of Last Estimate
SCP (Scoping)
2015
$569,017.15
PE (Preliminary Engineering)
2017
$3,787,485.00
5/1/2019
PE (Preliminary Engineering)
2020
$400,000.00
5/1/2019
PE (Preliminary Engineering)
2021
$390,000.00
5/1/2019
ROW (Right of Way)
2027
$32,016,000.00
8/6/2024
ROW (Right of Way)
2028
$48,024,000.00
8/6/2024
UTL (Utilities)
2030
$18,490,000.00
3/8/2024
CST (Construction)
2030
$99,862,477.97
4/27/2023
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=99f54aa4-4d84-4018-8609-d25f6c7b91c9&Filename=0007855_CR_JUN2019.pdf
0007855_CR_JUN2019.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=99f54aa4-4d84-4018-8609-d25f6c7b91c9&Filename=0007855_CR_JUN2019.pdf
Project Outreach Archive
http://mydocs.dot.ga.gov/PublicOutreach/0007855/PDF/0007855_PIOH_Handout_Jan_2017.pdf
0007855_PIOH_Handout_Jan_2017.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0007855/PDF/0007855_PIOH_Handout_Jan_2017.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0007855/JPG/PI-NO-0007855-SR42-US23-WIDENING%20PART%203_2017.pdf
PI-NO-0007855-SR42-US23-WIDENING PART 3_2017.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0007855/JPG/PI-NO-0007855-SR42-US23-WIDENING%20PART%203_2017.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0007855/JPG/PI-NO-0007855-SR42-US23-WIDENING%20PART%204_2017.pdf
PI-NO-0007855-SR42-US23-WIDENING PART 4_2017.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0007855/JPG/PI-NO-0007855-SR42-US23-WIDENING%20PART%204_2017.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0007855/JPG/PI-NO-0007855-SR42-US23-WIDENING%20PART%201_2017.pdf
PI-NO-0007855-SR42-US23-WIDENING PART 1_2017.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0007855/JPG/PI-NO-0007855-SR42-US23-WIDENING%20PART%201_2017.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0007855/JPG/PI-NO-0007855-SR42-US23-WIDENING%20PART%202_2017.pdf
PI-NO-0007855-SR42-US23-WIDENING PART 2_2017.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0007855/JPG/PI-NO-0007855-SR42-US23-WIDENING%20PART%202_2017.pdf